42/68
Paylaş
Resmi Orjinal Boyutunda Göster
HYDE Hotel Bodrum
Project Location:
Muğla, Bodrum
Project Office:
Yeşim Kozanlı Architecture
Tasarım Ekibi:
Yeşim Kozanlı, Sedef Güllüoğlu, Alain Güllüoğlu, Mehmet Kahraman, Esmanur Boyuktaş
Architectural Project Team:
Öznur Çağlayan, Ece Uğurlu, Hilal Bozkan
Employer:
Akkor Hotels / Ennismore
Ana Yüklenici:
TAŞEM İNŞAAT
Interior Architecture:
Yeşim Kozanlı Architecture
Projcet Manager:
Yeşim Kozanlı Architecture
Concept Design:
Yeşim Kozanlı Architecture
Construction Drawings:
Yeşim Kozanlı Architecture
Facade Design:
Öznur Çağlayan Studio
Lighting Project:
On Off, Ali Berkman
Electrical Project:
Gök-Ay Proje ve Mühendislik
Photography:
İbrahim Özbunar
Architectural Supervision:
Yeşim Kozanlı Architecture
Project Start Date:
2023
Construction End Date:
2024
Building Plot Area:
30.000 m2
Total Construction Area:
24.584 m2