58/68
Paylaş
Resmi Orjinal Boyutunda Göster
HYDE Hotel Bodrum
Project Location: Muğla, Bodrum
Project Office: Yeşim Kozanlı Architecture
Tasarım Ekibi: Yeşim Kozanlı, Sedef Güllüoğlu, Alain Güllüoğlu, Mehmet Kahraman, Esmanur Boyuktaş
Architectural Project Team: Öznur Çağlayan, Ece Uğurlu, Hilal Bozkan
Employer: Akkor Hotels / Ennismore
Ana Yüklenici: TAŞEM İNŞAAT
Interior Architecture: Yeşim Kozanlı Architecture
Projcet Manager: Yeşim Kozanlı Architecture
Concept Design: Yeşim Kozanlı Architecture
Construction Drawings: Yeşim Kozanlı Architecture
Facade Design: Öznur Çağlayan Studio
Lighting Project: On Off, Ali Berkman
Electrical Project: Gök-Ay Proje ve Mühendislik
Photography: İbrahim Özbunar
Architectural Supervision: Yeşim Kozanlı Architecture
Project Start Date: 2023
Construction End Date: 2024
Building Plot Area: 30.000 m2
Total Construction Area: 24.584 m2